Clark International Airport station
General information | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Clark Freeport Mabalacat, Pampanga Philippines | |||||||||||||||||
Coordinates | 15°11′56″N 120°33′24″E / 15.19881°N 120.55656°E | |||||||||||||||||
Owned by | Philippine National Railways | |||||||||||||||||
Operated by | Philippine National Railways | |||||||||||||||||
Line(s) | North Commuter | |||||||||||||||||
Platforms | Two island platforms | |||||||||||||||||
Tracks | 4 | |||||||||||||||||
Connections | P2P buses Clark International Airport | |||||||||||||||||
Construction | ||||||||||||||||||
Structure type | Underground | |||||||||||||||||
Parking | Yes | |||||||||||||||||
Bicycle facilities | No | |||||||||||||||||
Accessible | Yes | |||||||||||||||||
Other information | ||||||||||||||||||
Status | Under construction | |||||||||||||||||
History | ||||||||||||||||||
Opening | 2027 | |||||||||||||||||
Services | ||||||||||||||||||
|
Clark International Airport station is an under-construction underground North–South Commuter Railway (NSCR) airport rail link station located in Mabalacat, Pampanga, Philippines. The station will host the first direct airport rail link in the country, being connected to its namesake, Clark International Airport.[1]
Station layout
The station is located underground. It will have two island platforms and quadruple tracks, stemming at a section of the line underneath a roundabout for roads at ground-level. Allowances for a future transport hub have already been allotted and a parking lot is located atop the station.[2]
History
A rail link from Clark International Airport to the capital was originally planned in the 1990s.[3] The first proposal, called the "Manila–Clark rapid railway system", was discontinued due to disagreement on funding. In the early 2000s, the Northrail project was pursued. This involved the conversion the rail gauge from narrow gauge to standard gauge, and linking Manila to Malolos, Bulacan and eventually to Clark and the airport. While the project commenced in 2007, it was repeatedly halted due to allegations of overpricing, then discontinued in 2011.[4][5] The station is being constructed as part of the second phase of the North–South Commuter Railway.[1][6]
Design
The station will be built at the end of the Clark spur line of the NSCR, while the mainline will lead to the future New Clark City station in Capas, Tarlac. Without a railway wye to link the station with New Clark City, there are no direct segments linking the two sections.[2]
It will begin as an approximately 1,000 m (3,300 ft) quadruple-track segment of the mainline before splitting near the SCTEX–NLEX Interchange Road. From there, it will continue as an elevated line for at least 1,000 m (3,300 ft) before approaching an at-grade section in which the two depot tracks for the Mabalacat rail yard will meet the branch line. The Clark Airport-bound section will transition from at-grade to depressed before approaching a Y-junction with one of the depot tracks. At this point, the rest of the line will be underground until it reaches the station. According to detailed design documents, the maximum speed for this section is at 120 kilometers per hour (75 mph) due to a tighter curve radius.[2]
References
- ^ a b Paz, Chrisee Dela (25 June 2017). "17 stations of Manila-Clark Railway announced". Rappler. Retrieved 2019-04-24.
- ^ a b c T., Sekiguchi; V., Balakrishnan (May 6, 2019). MCRP Detailed Design, General Details for CP-N04: Bidding Documents. The Detailed Design Study (including Feasibility Study) of the Malolos-Clark Railway Project and the North-South Railway Project-South Line (Report). Vol. II. Japan International Cooperation Agency, Tokyo Metro Co. Ltd., et al.
- ^ "Off track: Northrail timeline". ABS-CBN News. Retrieved February 17, 2019.
- ^ Landingin, Roel. "Chinese foreign aid goes offtrack in the Philippines" (PDF). PCIJ (Philippine Center for Investigative Journalism). Archived from the original (PDF) on April 25, 2012. Retrieved October 20, 2011.
- ^ "Philippines: China-funded Northrail project derailed". Financial Times. Retrieved February 17, 2019.
- ^ Romero, Maria (March 8, 2021). "PNR Clark Phase 1 almost 50% complete–DoTr". Tribune.net.ph. Archived from the original on March 8, 2021. Retrieved March 9, 2021.
See what we do next...
OR
By submitting your email or phone number, you're giving mschf permission to send you email and/or recurring marketing texts. Data rates may apply. Text stop to cancel, help for help.
Success: You're subscribed now !