The D3 motorway (Czech: Dálnice D3) is a highway in the Czech Republic. Currently only the middle segment of the route is in operation; when complete, it will run from Prague via Tábor and České Budějovice to the Czech-Austrian border at Dolní Dvořiště. It is part of the European route E55.

The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2026.[1] Completion of D3 in the Central Bohemian Region is planned by 2028, however its designed course through the Lower Sázava landscape is still objected and opposed by environmental and citizens associations.

Course

Once completed, the 172-kilometre-long (107 mi) highway will connect the Czech capital Prague with the Austrian Mühlviertel Expressway (S10) to Linz. As of December 2019 only 69.6 km (43.2 mi) of the highway are in operation, a section from Mezno to Úsilné (near to České Budějovice), while a further 43.7 km (27.2 mi) from Úsilné to Czechia-Austria border are currently under construction. The most controversial and disputed section is the planned segment in the Central Bohemian Region.

A 24.0-kilometre-long (14.9 mi) section from Dolní Třebonín to the border with Austria on the other side of the future S10 expressway was initially planned to be built as an expressway (Czech: rychlostní silnice) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway.

Unfinished sections

Section Length Start of construction Completion
PrahaJílové u Prahy 9,51 km planned 2027 planned 2031
Jílové u Prahy – Hostěradice 4,49 km
Hostěradice – Václavice 11,29 km
Václavice – Voračice 16,70 km
Voračice – Nová Hospoda 16,45 km
Úsilné – Hodějovice 7,2 km 04/2019[2] 2024[2]
Hodějovice – Dolní Třebonín 12,5 km 03/2019[3] 2024[4]
Dolní Třebonín – Kaplice-nádraží 8,5 km 02/2022[5] planned 2024[5]
Kaplice-nádraží – Nažidla 12,0 km 6/2024 planned 2026
Nažidla – border with Austria 3,5 km 01/2024[6] planned 2026

Images

References

  1. ^ "ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí". iDNES.cz. 4 February 2019.
  2. ^ a b https://mapapp.rsd.cz/Upload/Stavby/39/infoletak_d3-usilne-hodejovice.pdf [bare URL PDF]
  3. ^ "Directorate of roads and highways" (PDF). Archived (PDF) from the original on 2019-01-13.
  4. ^ https://apdos.roadmedia.cz/Upload/Stavby/40/infoletak_d3-hodejovice-trebonin.pdf?t=2024-01-04%2017:52:01.863 [bare URL]
  5. ^ a b https://mapapp.rsd.cz/Upload/Stavby/48/infoletak_d3-trebonin-kaplice.pdf [bare URL PDF]
  6. ^ https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877 [bare URL]

49°22′47.29″N 14°43′27.32″E / 49.3798028°N 14.7242556°E / 49.3798028; 14.7242556

See what we do next...

OR

By submitting your email or phone number, you're giving mschf permission to send you email and/or recurring marketing texts. Data rates may apply. Text stop to cancel, help for help.

Success: You're subscribed now !