Trams in Ljubljana
You can help expand this article with text translated from the corresponding article in Slovene. (January 2012) Click [show] for important translation instructions.
|
Ljubljana Tramway | |
---|---|
Operation | |
Locale | Ljubljana, Slovenia |
Open | 6 September 1901 |
Close | 20 December 1958 |
Status | Closed |
Routes | 4 |
Operator(s) | Električna cestna železnica |
Infrastructure | |
Track gauge | 1,000 mm (3 ft 3+3⁄8 in) |
Electrification | 500 V DC |
Depot(s) | 1 |
Stock | 53 trams |
Statistics | |
Route length | 21 km (13 mi) |
The tram system in Ljubljana, the capital of Slovenia, was originally built in 1901 and was operated until 1958. Slovenia was then part of Austria-Hungary and Yugoslavia, respectively. Work started in 1900 and the tram was put in use after postponements and without a special ceremony on 6 September 1901.[2][3] The tram system's end came on 20 December 1958,[4] when it was replaced in a ceremony by 12 buses.[3]
History
On 1 January 1900, the mayor of Ljubljana Ivan Hribar proposed the construction of an electric tramway. Soon after Ivan's proposal, work began with the first tracks being laid in Spring of 1901. In Summer of the same year, the city began test journeys with the network officially opening on the 6th of September 1901. At the inauguration and for some time after, the tram network consisted of three lines with a rolling stock of thirteen trams and one unpowered trailer. The network also had a small truck for the maintenance and upkeep of the line. The line was 5220 metres long and was fully electrified to a current of 500V. The trams had a driver cab on either side, which meant no turntables were needed as they were able to drive the other way at a terminus point. The trams were able to accommodate a maximum of thirty people with a maximum speed of 18/mph.
The owner of the tramway was a firm called 'Splošna maloželezniška družba' (English: 'General small-railway group') that was a subsidiary of a German firm called 'Siemens & Halske'. In the first years of tram operation, the tramway did not bring in the expected profit the firm had hoped, so in the 1930s, the tramway went under the ownership of a new municipally-owned firm called 'Električna cestna železnica' (English: Electric road railway). In the years between 1931 and 1940, the city built more lines and extended the existing station platforms. The city then purchased fifteen pieces of new rolling stock; nine of these trams were locally made in the depot. From this point onwards, Slovenian engineer Feliks Lobe oversaw the tramway's new projects and expansions.
This expansion resulted in the tramway reaching a combined length of thirteen miles with 53 trams and nineteen unpowered trailers. A new depot was also constructed in Šiška. The depot in Šiška is the present day bus depot and some older residents of Ljubljana still call the bus depot 'Tramvajkomanda' (English: Tram Command Station).
During the second World War, the tramway operated relatively normally. The trams had bilingual signs, the timetable was adjusted to limit nighttime services, and there was a shortage of replacement parts. Two intriguing aspects of the tramway's operation during the war, is that the tramway's operation expanded and that Italian soldiers travelled on the trams free of charge. The line towards Šentvid even crossed the Italian border, where on Celovška Road there was a border crossing between Italy and "Slovenia" (Slovenia was occupied by Germany at the time), though unfortunately the German occupiers prevented the trams from crossing the border, meaning all tram journeys to Šentvid were ultimately cancelled.
After the second World War, the city tried to modernise the tram tracks and rolling stock, even though the tramway started to fall out of fashion with the locals. In 1951, a few trolleybuses began running on a brand new trolleybus line, it was the beginning of the end for the tramway. On the 20th of December 1958, the Ljubljana tramway made its last ever tram journey. The tram's "funeral" was experienced by a sizeable crowd. The tram tracks were demolished very quickly and the remaining usable rolling stock was sold to the cities of Osijek and Subotica, where they served for a few more years. Not long after the tramway's closure, there were proposals to reinstate it, although they just remained on paper.
Style of Operation
The tramway operated according to two published timetables; a summer timetable, and a partially reduced winter timetable. According to the most recent timetable, the trams started running at 06:00 and finished at 22:00 however during the winter, they started and finished half an hour early at 05:30, and then at 21:30. The interval of trams on the network was around every fifteen minutes between 09:00 and 22:00 according to said timetables, however in reality, the trams operated at a five to seven minute interval.
Tramway Network in the 1900s
Combined length of tramway network: 3.2 miles
Line Number | Route |
---|---|
Line 1 | Railway Station - Magistrat/Town Square |
Line 2 | Magistrat/Town Square - Military Hospital |
Line 3 | Magistrat/Town Square - Dolenjski Kolodvor |
Tramway Network in the 1940s
Combined length of tramway network: 13.2 miles
Line Number | Route |
---|---|
Line 1 | Šentvid - Ajdovščina - General Hospital |
Line 2 | Vič - Ajdovščina - Sveti Križ/Žale |
Line 3 | Magistrat - Rakovnik |
Line 4 | Post Office - Sveti Križ/Žale |
Plans for a New Tramway
According to the new Area Plan MOL (2008), that talks about changes to areas in Ljubljana to the year 2025, a new tramway that could potentially be built in the future would be the primary public transport option for the city. It would focus on the Celovška, Dunajska, Šmartinska, Zaloška, Barjanska, and Tržaška roads as they all meet near the city centre. This project could cost an estimated two billion euros.
Fate of the System
In the post-World War II era, many Yugoslav towns and cities with tram systems took out their systems, as they took up a lot of space in an era when it was needed for an increasing number of automobiles.[4] In its final form, established in 1940, the system reached length of 18.5 kilometres (11.5 mi).[5] Soon after the last day of operation the tracks were dismantled and the cars were transferred to Osijek and Subotica.[6] Reintroduction of an actual tram system to Ljubljana has been proposed repeatedly in the 2000s.[7][8]
See also
References
- ^ "Dokumenti Slovenskega gledališkega in filmskega muzeja" [The Documents of the Slovenian Theatre and Film Museum] (in Slovenian). 16–19. Slovenski gledališki in filmski muzej [Slovenian Theatre and Film Museum]. 1980: 128.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ Brate, Tadej (2001). Tramvaj pripoveduje [Tramvaj Tells a Story] (in Slovenian). Sanje Publishing Company. ISBN 9789616387088.
- ^ a b Kladnik, Darinka (2007). Mestna hiša v Ljubljani [Ljubljana Town Hall] (PDF) (in Slovenian and English). Ljubljana Tourist Board. pp. 25–26. COBISS 233506560.
- ^ a b "Historical Highlights: More than a century of memories and experience". Ljubljanski potniški promet [Ljubljana Public Transport]. Javni holding Ljubljana [Ljubljana Public Holding]. Archived from the original on 4 March 2012. Retrieved 9 March 2012.
- ^ Smolej, Viktor (1959). "Kronika: časopis za slovensko krajevno zgodovino". Kronika: časopis za slovensko krajevno zgodovino [The Chronicle: The Newspaper for the Slovene Place History] (in Slovenian). 8–9. Zgodovinsko društvo za Slovenijo [Historical Association of Slovenia]: 64.
- ^ Business.hr Editorial Office. "Potencijalni gradonačelnici obećali tramvaj, stadion i džamiju". Business.hr.
{{cite news}}
:|author=
has generic name (help) - ^ "Tramvaj ponovno v Ljubljani? Zares želi, da odločitev o tirnem prometu pade že zdaj". STA. dnevnik.si. Retrieved 30 December 2011.
- ^ "Vozilo, ki bi zanimanje vzbujalo še danes". MMC. rtvslo.si. Retrieved 30 December 2011.
External links
- Media related to Trams in Ljubljana at Wikimedia Commons
- Map of Ljubljana tram system on Geopedia
46°3′15.94″N 14°30′16.22″E / 46.0544278°N 14.5045056°E
See what we do next...
OR
By submitting your email or phone number, you're giving mschf permission to send you email and/or recurring marketing texts. Data rates may apply. Text stop to cancel, help for help.
Success: You're subscribed now !