Olidan Hydroelectric Power Station
This article needs additional citations for verification. (February 2007) |
You can help expand this article with text translated from the corresponding article in Swedish. (August 2024) Click [show] for important translation instructions.
|
Olidan Power Station (Swedish: Olidans kraftverk) is a hydroelectric power station located in Trollhättan, Sweden. First opened in 1910, it was the first large scale attempt at generating electricity from water in Sweden. The construction of Olidan led to the founding of the Kungliga Vattenfallsstyrelsen (Royal Waterfall Board), which later became Vattenfall.
While the first four turbines were put into service in 1910, construction continued, and another four were put into operation by 1914. Due to increasing demand, as well as increasing capacity due to the regulation of Göta älv, another five were then built. By 1921, Olidan carried a total of 13 turbines. 10 of these are still functioning, while the other three were cannibalized for parts. However, it is currently rare for more than three to be generating at the one time. Each turbine has a capacity of 10 MW.
When Olidan were completed in 1924, planning began for Hojum Power Station, which came into service in 1938.
Images
-
Olidan Power Station
-
Control room in 1940s
-
Engine Hall
-
Turbines
External links
58°16′27″N 12°16′20″E / 58.2742°N 12.2722°E
See what we do next...
OR
By submitting your email or phone number, you're giving mschf permission to send you email and/or recurring marketing texts. Data rates may apply. Text stop to cancel, help for help.
Success: You're subscribed now !